Key dates

M1 - Testable Prototype for Early Partner Discussions

Done
Jun 8, 2026Sep 11, 202695 days

M2 - Validate the prototype

Close the five open district confirmations and put the Grade 4 Q1 guide in front of the teachers who would run it.

  • Confirm CKLA unit order by quarter, Ready Math pacing, and whether Mystery Science unit order is actually flexible.

  • Confirm arts specialist involvement and whether collaborative planning time exists.

  • Name the pilot grade and teacher team for the coming year.

  • Write the definition of done for an arc — the rubric that later becomes the automated validator set.

  • Exit criteria
    A teacher team walks the Q1 arc unaided and says they could run it, plus a written arc rubric.

Sep 7, 2026Sep 24, 202617 days

M3 - Turn the framework into a schema

The single highest-leverage step. Convert the prose design principles into a machine-readable model so that generating an arc becomes filling a structure, not writing a document.

  • Define the arc data model — district, program, pacing week, standard, concept, subject thread, touchpoint, alignment record, culminating product.

  • Build the two output templates as renders of that model: leadership overview and teacher implementation guide.

  • Encode the rubric from Phase 0 as executable validators.

Exit criteria The Q2 prototype is re-expressed as structured data and re-rendered from it with no loss of quality.

M4 - Scale inside one district

Build all of K–5 for Jefferson County — roughly 24 arcs — with human experts on the schema and light tooling. Instrument the work from arc #1 so the automation targets are measured, not guessed.

  • Track hours per arc, edits per arc, and which steps consume the time (standards reading, overlap hunting, asset search, or writing).

  • Harvest reusable pieces: standards overlap maps, per-program pacing normalizations, the culminating product menu.

  • Ship arcs continuously to the pilot so instructional feedback arrives during the build, not after.

Exit criteria
Median build time per arc down 60%+ from arc #1 to arc #24, with a time breakdown that names the bottleneck.

M5 - Automate the alignment

Build the engine that does the mechanical work: reading pacing guides and standards, detecting genuine overlap, and attaching the right DE assets to the right week. Detailed in the next section.

Exit criteria
≥85% of proposed alignments accepted with no edit; expert review under two hours per arc.

M6 - Make it district- and program-agnostic

Everything district-specific becomes configuration data. Nothing about Alabama or Mystery Science is hard-coded anywhere.

  • Curriculum program library: each publisher’s scope and sequence normalized once, versioned, and reused by every district that licenses it. Onboarding district #2 with the same programs costs nothing.

  • Standards crosswalk: every state’s standard set resolved to the same canonical concept layer, so overlap detection works in any state without pairwise mapping.

  • Proof: a second state with a different publisher stack, built with no code changes.

Exit criteriaA new district is live in ≤2 weeks with zero engineering involvement.

M7 - Productize

Turn the internal pipeline into a surface other people can drive.

  • Authoring workbench opened to district curriculum staff, not just DE experts.

  • Teacher delivery experience inside DE — the arc as a live, dated plan rather than a PDF.

  • A library of published arcs, filterable by state, publisher stack, and grade.

  • Usage telemetry and teacher edits feeding back into alignment scoring.

Exit criteria
A district authors a usable arc without DE in the room.